Tuesday, October 11, 2016

- IMPORTANT -
PERMISSION TO OPT FOR PAY FIXATION ON A DATE AFTER THE DATE OF ISSUE OF CCS (RP) RULES 2016 NOTIFICATION 25-07-2016 IN CASE PROMOTION BECOMES DUE AFTER 25-07-2016 - CONFEDERATION WRITES TO FINANCE MINISTRY FOR CLARIFICATORY ORDERS



No.Confdn/7th CPC/Option/2016-17                                                   10-10-2016

To             Shri.R.K.Chathurvedi,
                 Joint Secretary to Govt. of India,
                 Ministry of Finance,
                 Department of Expenditure
                 (Implementation Cell),
                 Room No.124, The Ashok, North Block,
                 New Delhi - 110 001.
Sir,
  Sub:   Exercising option for pay fixation in the revised 7th CPC Pay Structure, from the date of promotion or from the date of next increment from
01-01-2017 - C/o. Officials who are due for promotion/upgradation from Grade Pay 2800 to 4200 during the period from 01-01-2016 to
01-07-2017 - Request clarification and permission to exercise revised option as a one-time measure.
1.      As per Rule 5 of CCS (RP) Rules, 2016 the following provisions are notified by Government on 25-07-2016:
 Rule 5 - Government servant may elect to continue to draw pay in the existing pay structure untill the date on which he earns his next increment or any subsequent increment in the existing pay structure or until he vacates his post or ceases to draw pay in the existing pay structure.
 Provided further that in cases where a Government servant has been placed in a higher grade pay or scale between 1st day of January 2016 and the date of notification of these rules (ie. 25-07-2016) on account of promotion or upgradation, the Government servant may elect to switch over to the revised pay structure from the date of such promotion or upgradation as the case may be.
2.      As per the above two provisions, a Government servant may elect to continue to draw pay in the existing pay structure until he earns his next or any subsequent increment in the existing (pre-revised) pay structure which implies that in cases where there is no promotion/upgradation between 01-01-2016 to 30-06-2016 (or between 01-01-2016 to 30-06-2017 in the case of subsequent increment on  01-07-2017) option to opt from the date of next increment (01-07-2016) or subsequent increment (01-07-2017) is available, thereby forgoing the arrears from 01-01-2016 to 30-06-2016 (next increment) or upto the date of subsequent increment say, 01-07-2017.
3.      Thus, in the case of promotion/upgradation of a Government Servant becoming due before the date of notification ie, 25-07-2016, he should elect to switch over to the revised pay structure from the date of such promotion/upgradation.  He has no option to opt for the next increment (becoming due after the date of promotion/upgradation) for fixation of pay in the revised pay structure. 
4.      Subsequently a clarificatory order is issued by Department of Expenditure (Implementation Cell) on 29th September 2016, which clarified the position further.  As per this clarification, in case an employee is promoted or upgraded to the higher pay structure (in the pre-revised pay structure) he may be permitted to exercise revised option to have his pay fixed under the Revised Pay Rules 2016 from the date of such promotion/upgradation or from the date of next increment as per FR-22(i)(a)(i).
5.      Thus an official who got promotion/upgradation on 15-07-2016 (in the month of July 2016), can exercise option to fix his pay under Revised Pay Rules, 2016, either from the date of promotion or from the date of next increment ie; on 01-07-2017.
6.      Even after issuing the above clarificatory orders, dated 29-09-2016, it is not clear, whether an employee who becomes eligible for promotion/financial upgradation on a date after the date of issue of notification, ie, 25-07-2016, but before the date of next increment ie. 01-07-2017, can exercise option now, for fixation of his Revised Pay as per CCS (RP) Rules, 2016, from the date of promotion or from the date of next increment, ie; 01-07-2017, by forgoing the arrears from 01-01-2016 to date of promotion or 30-06-2017, thus allowing him to draw his pay in the pre-revised pay structure of 6th CPC till the date of promotion or till the date of next increment on 01-07-2017.  As per the existing orders, all those employees whose date of promotion/upgradation becomes due after 25-07-2016 should compulsorily opt for pay fixation from 01-01-2016 or 01-07-2016, whereas an employee whose promotion is due in July 2016 ie; before the date of notification (25-07-2016) can opt for next increment date on 01-07-2017 for fixation in the Revised Pay structure under FR-22(i)(a)(i).    Since the benefit is extended to a section of employees who were promoted between 01-01-2016 and 25-07-2016 and the same benefeit is denied to the rest of the employee who are promoted after 25-07-2016, this is a clear case of discrimination and denial of natural and equitable justice.
7.      If the option as above is not allowed, thousands of employees who are due for promotion/financial  upgradation from 2800 Grade Pay to 4200 Grade Pay (in the pre-revised pay structure) from a dateafter the date of notification ie. 25-07-2016, will suffer a recurring loss of Rs.2800 to 3000 per month, throughout their service.


   The following illustrations will explain the above facts:
1st OPTION - 7th CPC - OPTION FROM 01-01-2016
                                                 6th CPC                                   7th CPC
 Basic as on 01-01-2016                16490                       16490x2.57 = 42379. 
 Next stage in the pay matrix level - 5 = 42800

Increment on 01-07-2016                                         42800x3%=1284, 42800+1284=44084. 
Next stage in the Pay matrix = 44100.

MACP-II promotion from                                          44100x3%=1323, 44100+1323=45423.
2800 GP to 4200 GP on 05-12-2016                       Next stage in the pay matrix level-6 
(one increment fixation)                                          = 46200.

2ND OPTION (IF ALLOWED) - OPTION FROM DATE OF SUBSEQUENT INCREMENT ie; 01-07-2017.

                                                    6th CPC                          7th CPC fixation if option allowed
                                                                                            from date of promotion
                                                                                            or date of next increment on
                                                                                            01-07-2017

Basic as on 01-01-2016              16490                             
Increment on 01-07-2016         16990                                 
MACP-II promotion from 2800   16990x3% notional         18900x2.57-48573.  Next stage
GP to 4200 GP on 05-12-2016   increment - 510.               in the pay matrix in level 6 =
(One increment fixation +           Grade pay difference=   49000.

Grade Pay difference)               4200-2800 = 1400.          (If option allowed from date of
                                                    Total Basic = 16990+        promotion).
                                                    510+1400=18900.
Increment on 01-07-2017         18900x3% = 567            19470x2.57 = 50038
                                                    = 18900+567 = 19467     Next stage in the pay matrix level
                                                    = 19470                           6 = 50500.  (If option allowed from
                                                                                            date of next increment).

                 Thus if no option is permissible after 25-07-2016 to fix the pay in the revised scale on the date of promotion ie. 5-12-2016, then by compulsory option from 01-01-2016, the pay will be fixed at 46200 on promotion.  If option is permissible after the date of notification to fix the pay in the revised scale on the date of promotion, the pay will be fixed at 49000.  The difference is Rs.2,800/-.  If option for fixation on next increment on 01-07-2017 is granted, then the difference will increase further. 
                 In view of the above, it is requested that the case may be reviewed judiciously and clarificatory orders may be issued, permitting the employees whose promotion date become due after the date of notification (25-07-2016) also, to exercise option for fixation of their revised pay from the date of promotion/upgradation or from the date of next increment ie. 01-07-2017, as a one time measure, thereby forgoing the entire arrears from 01-01-2016 to date of promotion or date of next increment on 01-07-2017. In other words, they may be permitted to draw their pay in the pre-revised 6th CPC pay structure till the date of promotion or till the date of next increment on 01-07-2017.
                 Awaiting favourable orders,
                                                                                           Yours faithfully,

                                                                                              M.Krishnan,
                                                                                        Secretary General,
                                                                                                        &
                                                                              Standing Committee Member,
                                                                           JCM National Council (Staff side).
                                                                                       Mob: 09447068125.
                                                                          Email: mkrishnan6854@gmail.com
Copy to:
1)      The Secretary,
          Ministry of Finance, Department of Expenditure,
          North Block, New Delhi - 110 001 - for favourable action please.



Cadre Restructuring of Group-C Employees in Department of Posts - Odisha Circle


Department of Post, India
Office of the Chief Postmaster General, Odisha Circle
Bhubaneswar-751001

Memo No:- EST/1-2/Rlg/2016-Corr                 Dated at Bhubaneswar the 07.10.2016

Sub :- Cadre Restructuring of Group-C employees in Department of Posts.


In pursuance of Directorate memo No.25-04/2012-P.E.I dated 27.05.2016, the number of posts in  Postal Assistants (PA), Lower Selection Grade(LSG), Higher Selection Grade II (HSG-II), Higher Selection Grade I (HSG-I) and also a new HSG-I ( Non Functional Grade) in Odisha Circle are hereby created with abolition of required number of posts . The details of such posts abolished and created is enclosed as Annexure-I. The Divisional / Unit Heads will correct / revise their Establishment Register accordingly.

1.     Abolition of posts :-

i)           The post of SPM in all Single Handed Post Offices /Double Handed Post offices (except the offices shown in Annexure-II) are hereby abolished.

 
ii)         The post of SPM in all Triple Handed Post Offices and existing norm based LSG posts are hereby abolished.

iii)       All the existing HSG-II posts ((except the offices shown in Annexure-III) have been abolished.

2.     Creation of posts :-

i)           The posts of LSG shown in Annexure-LSG in respect to the Divisions are hereby created on abolition of posts at 1 (i ) above.

 
ii)         The posts of HSG-II shown in Annexure-HSG-II in respect to the Divisions are hereby created on abolition of posts at 1 (ii) above.

 
iii)       The posts of HSG-I including HSG(NFG) ( except existing HSG-I) shown in Annexure-HSG-I in respect to the Divisions are hereby created on abolition of posts at 1 (iii) above.
Encl:- as above
( A.K.Rath)
Asst Director (Estt/Plg)
O/o the Chief PMG, Odisha Circle
Bhubaneswar-751001

Copy for kind information and necessary action to :-

1.      The PMsG , Berhampur / Sambalpur Region.
2.      The Director of Accounts(P), Cuttack-4
3.      The Asst. Director (Staff), Circle Office, Bhubaneswar.
4.      All the Group Officers, Circle Office, Bhubaneswar.
5.      All the SSPOs/SPOs in Odisha Circle.
6.      Sr. Postmaster Bhubaneswar GPO/ Cuttack GPO.
7.      The Superintendent PSD, Bhubaneswar/ Sambalpur
8.      The Superintendent , CSD, Bhubaneswar.
9.      All the Postmasters, Head Post Offices in Odisha Circle.
10.  Office Copy.
(.के. रथ / A.K. Rath)
सहायक निदेशक (स्थापना/योजना)
Asst Director (Est/Plg)
क्रुते चीफ पीएमजी, ओडिशा सर्किल
for Chief PMG, Odisha Circle
    ANNEXURE-I

ABOLITION AND CREATION OF GROUP-C POSTS AFTER CADRE RESTRUCTURING


Name of the Division

Abolition of posts on Cadre Restructuring

Creation of posts on Cadre Restructuring
PA
LSG
HSG-II
Total
LSG
HSG-II
HSG-I [ including HSG-I (NFG)]
Total
Aska
38
3
2
43
33
8
2
43
Balasore
57
4
1
62
53
8
1
62
Berhampur
71
8
3
82
67
12
3
82
Bhadrak
48
3
1
52
46
5
1
52
Bhubaneswar
56
10
3
69
52
14
3
69
Bolangir
48
3
2
53
44
7
2
53
Cuttack City
52
14
2
68
47
19
2
68
Cuttack North
65
6
1
72
64
7
1
72
Cuttack South
47
4
1
52
43
8
1
52
Dhenkanal
47
6
2
55
39
14
2
55
Kalahandi
34
3
1
38
30
7
1
38
Keonjhar
46
3
1
50
45
4
1
50
Koraput
77
5
3
85
69
13
3
85
Mayurbhanj
80
6
2
88
76
10
2
88
Phulbani
37
2
1
40
37
2
1
40
Puri
69
8
3
80
62
15
3
80
Sambalpur
71
9
4
84
64
16
4
84
Sundergarh
65
8
3
76
60
13
3
76
Total
1008
105
36
1149
931
182
36
1149

Annexure-II

NDSO TO BE RETAINED AS NDSO AFTER CADRE RESTRUCTURING OG GROUP-C EMPLOYEES


Sl No

Division

No. of NDSO which to be retained as NDSO

Name of the Posts which is to be retained as NDSO

Name of the Post Office
1
Aska
2
SPM
Bhanjanagar College NDT SO
2
SPM
Taluka Office Road NDT SO
3
Balasoe
3
SPM
Mobarakpur NDSO(C Class)
4
SPM
Soro College NDSO(C Class)
5
SPM
Nilgiri College NDSO(C Class)
6
Berhampur
4
SPM
Braja Nagar
7
SPM
Kanisi Hata
8
SPM
Chatrapur Bazar
9
SPM
Hospital Road (Parlakhemundi)
10
Bhadrak
2
SPM
Chandbali Bazar SO
11
SPM
Uttarbahini SO
12
Bhubaneswar
4
SPM
Airport NDTSO
13
SPM
Madhu Sudan Nagar NDTSO
14
SPM
Kedargouri NDTSO
15
SPM
Dolabedi Chhak NDTSO
16
Bolangir
2
SPM
Titilagarh Hatpadapara NDT SO
17
SPM
SO nepur Spinning Mill NDT SO
18
Cuttack City
6
SPM
Banki College SO
19
SPM
Darghabazar SO
20
SPM
Gandhibhawan SO
21
SPM
O.G.Press SO
22
SPM
Odisha School of Engineering SO
23
SPM
Pattapole SO
24
Cuttack North
4
SPM
Dolipur NDSO
25
SPM
Pattamundai College NDSO
26
SPM
Kendrapara College Campus  NDSO
27
SPM
Jajpur College NDSO
28
Cuttack South
1
SPM
Athagarh College NDSO
29
Kalahandi
2
SPM
Bhawanipatna Bahadurbagichapada NDTSO
30
SPM
Kesinga Jagganath Mandir Pada NDTSO
31
Keonjhar
2
SPM
Sundar Shiv Mandir ‘C’ Class SO
32
SPM
Keonjhar Mining School C” Class SO
33
Koraput
2
SPM
Rayagada Bazar S.O.
34
SPM
Marathiguda S.O.
35
Mayurbhanj
3
SPM
Belgadia NDTSO
36
SPM
Mahuldiha NDTSO
37
SPM
Udala College NDTSO
38
Phulbani
2
SPM
Madikunda  NDTSO
39
SPM
Nuasahi NDTSO
40
Puri
4
SPM
Orissa Engineering College
41
SPM
Retang Colony
42
SPM
Sinduria
43
SPM
Locosettlement
44
Sambalpur
2
SPM
GoshalaChowk  SO
45
SPM
SR Brajrajnagar SO
46
Sundergarh
4
SPM
PIET Mandiakudar NDTSO
47
SPM
Railway Colony NDSO
48
SPM
LC Bondamunda NDSO
49
SPM
BrahmaniTarang NDSO
( A.K.Rath)
Asst Director (Estt/Plg)
O/o the Chief PMG, Odisha Circle,
Bhubaneswar-751001
Annexure-III

HSG-II POSTS WHICH WILL REMAIN AS HSG-II STATUS


Sl No.
Name of the HSG-II posts which will remain as HSG-II
1
DPM, jaleswar HO
2
DPM, Athagarh HO
3
SPM, Marshaghai SO
4
DPM, Chhatrapur HO
5
SPM, Berhampur City
6
SPM, Kesinga SO
7
Postmaster, Barbil MDG
8
Dy. Manager, PSD, Bhubaneswar
9
Dy. Manager, PSD, Sambalpur


( A.K.Rath)
Asst Director (Estt/Plg)
O/o the Chief PMG, Odisha Circle
Bhubaneswar-751001

No comments: